Three Heads Beer Keg Washer And Filler

Hot

New Product Ad posted 6 months ago in Kegging Equipment by Chenma Machinery Co.

Three Heads Beer Keg Washer and Filler is a specialized piece of equipment used in the brewing industry for cleaning and filling kegs efficiently, The “three heads”(2heads for keg washer, 1head for keg filler), the three stations that can handle these kegs simultaneously, greatly improving productivity.

Product Details For three heads beer keg washer and filler:

Machine Details BEER KEG WASHER AND FILLER
1 Size:W*L*H 1.80X2.30X2.08M
2 Weight 680KG
3 with slide or not Yes
4 Packing Size (L*W*H) 2.33X2.05X2.30M
5 Gross Weight 1019KG
6 Capacity Washing part:40-50kegs/hour, filling part:40-50kegs/hour.
7 Power According to user local power
8 Power port 3P+N+G
9 Heating way Steam/electric heating
10 Power consumption 3kw for steam heating, 15kw for electric heating.
11 Main Material AISI304
12 Water tank material and volume SUS304 Single tank / Volume=100L (3pcs)
13 Motor type and brand SUS304 Pump Head
14 Temperature prode NTC
15 Temperature  control mode STC-200
16 Time setting way Siemens PLC 200 smart
17 Connect type water inlet and drain outlet:1.5″ Tri-clamp, Steam inlet:DIN male fitting
18 Spear type A, S, D, G
19 Keg type EURO DIN AMERICAN 20L-60Lkeg
20 Filling measurement type Flow Switch or Flow Meter
21 Washing part inlet with pressure detection or not it depend on customer’s requirement.
22 The table can rise or not Yes
23 Washing part outlet with the residual liquid detection or not it depend on customer’s requirement.
24 Washing working procedure Lock down →Rinse water washing→ air purge/drain off → caustic washing → air purge/to caustic tank → hot water 1 washing → air purge/drain off →hot water 2 washing →steam purge/to rinse water tank→steam sterilized → steam keep pressure sterilized→CO2 purge/drain off→CO2 fill
Lock down→ air purge/drain off → hot water 1 washing→ air purge/drain off → caustic washing → air purge/to caustic tank → hot water 2 washing → air purge/drain off →acid washing → air purge/to acid tank→hot water 3 washing →steam purge/drain off →steam sterilized → steam keep pressure sterilized→CO2 purge/drain off→CO2 fill
25 Filling working procedure Lock down→ sterilize → CO2 purge→ spear open → CO2 fill→ filling→ spear close→ hot water washing spear→CO2 purge/drain off →Stop
26 Package Composite board boxes
27 Lead time 40-45 days

Please contact us for price and details!

Shandong Chenma Machinery Co., Ltd

Email: admin@sdchenma.com

Cel/Whats App:008613789827830

Website: www.chenmabrewing.com

  • Manufacturer : Shandong Chenma Machinery Co., Ltd
  • Where Manufactured : China
  • Ships From : Jinan, China
Contact Details

Available from
 Phone: 008618063421809 *****  Allied Trade Profile

To top